In 1947, the University of Corpus Christi was set up on Ward Island. Ward Island was a Naval Training Station in use during WWII. Fortunately, the university founders inherited a fully fledged campus complete with buildings. These buildings include sixteen classroom buildings, an administration building, a gym, two swimming pools, several football practice fields, and baseball fields with grandstands. A number of military buildings include a medical center, a student center, library, chapel, an outdoor assemby area, and housing. (Wrotenbery, 1998). These buildings however, would not stay forever. This exhibit will explore the changing master plan for the university on Ward Island, how it adapted based on its leader’s vision, to external factors, and its environment.
A master plan was developed in 1952 by Harland Bartholomew and Associates. In a four stage program, the university sought to eliminate the original wooden military buildings and replace them with fewer, functional contemporary academic buildings. These new buildings were planned to be economical, adaptable to climate, and functional. Buildings are faced to take advantage of the ocean breeze with most of the buildings having a flat roof with an overhang. The master plan was designed to accommodate 3,000 students (Proposed Development of the University of Corpus Christi., 1952).
The campus plan provides floor plans and concepts of the majority of the buildings and groups them together in units. The first group contains the Student Union and Faculty housing. The Student Union was designed to be a place for students to be social and hold functions such as banquets. Amenities for this building include a kitchen, soda bar, banquet hall, club rooms, a cafeteria, and a quiet room on the second floor. Concept art includes an outdoor dining area, covered in palm trees, sandwiched between the “L” shaped student union with the large swimming pool. A second floor provides meeting rooms and a quiet room that oversees the outdoor areas which allow students to enjoy the aesthetic from a space of peace and quiet (Proposed Development of the University of Corpus Christi., 1952).
The faculty housing would be located on the northwest corner of the campus near the city entrance of the island where the Harte Building and Momentum sculpture stands today. These were planned to be a group of six buildings, three stories each, with an open terrace as the first floor and the two upper floors would be for living. One building was to be a bachelor building and a community center near the water (Proposed Development of the University of Corpus Christi., 1952).
The heart of the campus, between the two entrances, would be a lake that goes from the center of the island, flows under a street, and stops short of ocean drive. This lake would be surrounded by bushes and palmtrees and have a sidewalk to surround it. The lake would end at the university library and chapel buildings. The university library was to be a circular building surrounded by a horseshoe sidewalk with an open plaza that oversees the lake at the back. Next to the library would be a chapel building.that hosts a garden between the entrance and the street covered by an enclosed terrace. (Proposed Development of the University of Corpus Christi., 1952).
The Creative Arts Center was to be placed at the back of the campus. This center would consist of an auditorium, drama workshop, fine arts classroom building, and an outdoor amphitheater. The amphitheater would be hidden behind the classroom building and the stage overlooking Oso Bay. This is the only occurrence in this master plan that discusses using the bays as an aesthetic advantage. There is, however, a drawing of the completed campus that contains a pier where the modern “second entrance” meets the modern University Beach, however, details about it are omitted in the plan itself. (Proposed Development of the University of Corpus Christi., 1952).
Six classroom buildings, an administration building, and an infirmary would make up the core of the campus with a spacious, green quad in the center. The buildings would be joined with a covered pathway. A precursor to the modern breezeway or “spine.”.the buildings would be three stories with offices, classrooms, and lecture halls. (Proposed Development of the University of Corpus Christi., 1952).
Athletic facilities were to be shared between intercollegiate and intramural sports.The southeast corner of the island would contain a football stadium, tennis courts, baseball and softball diamonds, basketball courts, volleyball volleyball courts, soccer fields, and a field house that leads to the student union building. (Proposed Development of the University of Corpus Christi., 1952).
North of the athletics are the dorms for married couples, men, and women. The married couple cluster would contain six living buildings, a service center, and a community center. The men’s dorm would consist of four buildings and a dining hall, the women’s dorms would consist of four buildings and their own dining hall. A lack of concept images for these dorms shows the university’s ability to be flexible depending on reality. Vocational buildings were clustered with the maintenance buildings behind the faculty housing, These buildings were omitted in the updated version as well as a president’s house. (Proposed Development of the University of Corpus Christi., 1952).
In 1957, President Miller reported that the Southern Association of Colleges and Schools gave him a list of things needed in order to become fully accredited. Amongst those things were a fire-proof library, administration building, male dorm, female dorm, and one classroom building. Influencing the order in the updated plan. (Wrotenbery, 1998)
Steps toward the master plan began in 1955, three years after the announcement of the plan. The first unit was a dorm made of brick for women. It would house 84 beds with a bath between two rooms. Space was made for a house mother and lounge. The building was dedicated to Gazzie Warren, a board member, and named Warren Hall. (Wrotenbery, 1998)
1956 saw the creation of the administration building. The building replaced the naval admin building. The building cost $100,000 dollars and was made of brick. A second floor was added the following year to house the library in a fireproof building. That same year, 1957, President Miller was given a shovel to move the first piece of dirt for a men’s dorm that would house 100 men. That dorm would be named Miller Hall and be made with a federal loan of $309,000. The need to take a loan to expedite the building process may not be attributed to the desire for accreditation, but the increasing population. Between 1952-55, the university was receiving an additional 100 students per year going from 600 to 800. The population dropped back to 600 the following year only to return to 800 the following year. (Wrotenbery, 1998)
The sixties saw continued progress toward the plan with familiar buildings. The science building was dedicated in 1969 during Marine Science week, It was called the United States Geological Survey Building as the university leased it to the federal government, The building cost $148,485 and was the first of the classroom buildings. Today that building is called Classroom West. The library was built in 1963, a two-story round building with a view of Corpus Christi bay on the second floor. Newspapers predicted that this would become the heart of the education program. The building was suggested to be named after Mary Holdsworth Butt, the wife of HEB. She declined, as the library was a gift from the entire Butt family, not just her. The Butt family never was dedicated to the building. (Wrotenbery, 1998)
The last years of UCC saw the creation of the Student Union, another men’s dorm, and the field house. The Student Union was named after Gus Glasscock, late husband of the donor Lucille Glasscock, who gave the university $150,000 to build it in 1967. A men’s dorm was also being built. No name was given to the dorm. The university launched a campaign to raise funds for a new field house for $150,000. The Moody Foundation of Galveston offered $100,000 if the university matched it. Ground would be broken and the university would receive a building with a college-size basketball court, basketball-cross courts, two indoor tennis, eight badminton courts, classroom space, offices, showers, and equipment storage. (Wrotenbery, 1998)
The development came to a halt with Hurricane Celia in the Summer of 1970. Most of the campus buildings had windows facing Corpus Christi Bay but due to circular wind, the force was felt from the back of the campus. Half of all the windows broke, the science building had a hole the size of a classroom, another hole was found in the administration building over a faculty members’ office. The food center (military era building) lost all but one of its windows as well as a wall ripped out, All the dorms had broken windows and damaged rooms and the recreation center disintegrated. The field house had a a hole in the roof the size of a classroom. The library had 55 window panels destroyed and over 10,000 books and 250 periodicals were destroyed beyond the point of salvage. (Wrotenbery, 1998)
The Baptist Convention of Texas eventually turned the campus over to the state. The transition from private to public called for a new reimagining of the campus as it was surely going to pass 3,000 people. .
The 1973 master plan for A&I-CC took a dramatically different direction. They wanted to keep the best of the UCC buildings and add new complexes that contribute to the aesthetic and functions of the new institution. It was this plan that introduced the concept of the “spine,”:or what students now call the breezeway. The campus will initially center on this axis before building out to the rest of the island. This would allow for continued use of the UCC buildings, which were more scattered, until it was time to phase them out. This plan also introduces a concept of a loop road towards the back of the campus for vehicles to move from one side of the campus to the other. Along the loop road would be lowered parking lots to decrease the walking distance, Bus stops would also be placed along various points on campus. Lounges would be along the axis.Lowered parking lots pull attention away from the cars and more on the water ("Layout of Campus to Change," 1973)
The anticipated demographic shift also affected the decisions of the master plan. Switching from a four-year private institute to an upper level college gave the leaders a predicted median age of 28-30Many students would have their own homes, jobs and families and come to school part time ("Layout of Campus to Change," 1973). Because of this, a noticeable element missing from the 1973 master plan is a lack of additional campus housing. Miller Hall, one of the first dorms built from the UCC era, was turned into a faculty office building ("A&I-CC faculty office space ready," 1975).
A few projects were achieved during the short lived A&I-CC era. The first building created, in the A&I-CC era, was Corpus Christi Hall. A building initially designed for additional classroom space ("A&I-CC classroom building named "'Corpus Christi Hall'," 1975). The Center for the Arts provided performing, practice and rehearsal spaces for performing majors as well as a photography lab, tv studio, offices, and classrooms. The Bell Library was created to replace the “round building” as the library. The round building was converted into a support services building. The Center for Sciences was also constructed at this time period ("Construction booming at A&I-CC," 1977)
Requested funding did not always go through as hoped. President Holloway requested $4.7 million dollars for 1974 and $7.6 million for 1975. However, 1975 was only given about 2 million for 1975 (020973).Construction budget was the $5 million omitted. According to the USST chancellor Jernigan, the legislation board had, “no pattern to go by for Corpus Christi since it is a new school.” ("Legislative Board Proposes Cuts in A&I Budget," 1973).
Many of the buildings from the A&I-CC era started their construction as A&I-CC, but completed construction as Corpus Christi State University. While A&I-CC focused on building academic buildings, CCSU put efforts into facilities for faculty and began to reconsider dorms. The Faculty Center would open 1981 ("Dedication is set for CCSU facility.," 1981). The original faculty buildings, named Faculty Center I and II were repurposed. FC I became a dorm called “Seabreeze Hall” FC II would become “Continuing Education. ("University board will move office to King Ranch," 1981). Two square buildings named “Sandpiper” and “Driftwood” were built as dorms ("CCSU planning apartments," 1981). A feasibility study of a 400 person dorm building was conducted (Reiste, 1981). Creating the first ideas for the Miramar student housing complex.
As the population university's population grew, a new master plan was created in 1988. Unlike earlier blueprints, this plan did not map out the entire island, intentionally leaving several zones designated simply for "future" development to maintain flexibility. To accommodate its growing population, the university outlined several key infrastructure priorities: a Loop Road at the rear of the campus, additional dormitories, and a third-floor expansion for Bell Library to house computers, humidity controls, and new acquisitions. The plan also introduced early concepts for two major campus landmarks: a Student Conference Center to replace the Glasscock building as the student union (eventually realized as the University Center), and a new classroom facility that would evolve into the Center for Instruction.
The 1988 plan was created a year before the South Texas Border Initiative. A mandate to fund nine underdeserving universities. As a response to the new mandate, the 1988 plan was scrapped and an updated version was created in 1990. The Legislative Joint Committee On Higher Education suggestions and funding mandates for Corpus Christi State University served as the basis and is often cited in the document. While the master plan for the University of Corpus Christi, in 1952, was to cover 20 years this plan was to cover 30 making it the longest timeframe for the university master plan in its history. Findings that influenced the master plan included
- CCSU is to become a 4-year institution by 1994
- The first freshman class cannot exceed 400 students
- Several undergrad and graduate degrees to be started before the arrival of the freshmen
The plan was divided into three milestones: 1994, 2000, 2010.
1994- expected population: 5K
To be completed by the arrival of the freshman was Phase I of the new University Center that would define the university's core. The plan calls for additional science facilities as well as the renovation of existing landmarks including the Bell Library, Corpus Christi Hall, and the Faculty Center. To improve circulation and aesthetics, distinct zones would be established to separate vehicle and pedestrian traffic, while a dedicated zone for maintenance buildings would be concealed by surrounding flora. Finally, the plan introduces on-campus housing through a five-story dormitory positioned at the edge of the "spine" at the end of the island—a design intended to capture ocean views, enhance the university's "water character," and serve as the initial concept for Miramar.
2000- expected population: 7,100 people
The next phase of campus development includes expanding both the Library and the University Center, alongside constructing a second five-story building. Additionally, several existing campus structures will be repurposed: the Round Building, which previously served as the administration building, will become the university's "museum" to house special collections, while Corpus Christi Hall will take over as the new administration building.
By this time, the spine was to be completed. Two piers would be at each end of the spine overlooking the bays. The piers would strengthen the relationship between the institution and the bays. The one overlooking Corpus Christi bay would have a pedestrian bridge that connects to the second floor of CC Hall. Physical education would be located on the lower half of the university near the water in a similar place to the 1952 plan. The location would encourage water sports to the institution. Additional education buildings would be constructed.
2010- expected population: 12,000
The piers would have defined purposes. Corpus Christi Bay would be recreational and Oso Bay would be for research. Miramar would be completed. The additional buildings would be two stories and be further than the rest of the campus. This would create an option for students to have a quieter, less congested dorm experience.
In 1993, the university received a sizable fund to begin construction. The 4 CCU campaign contributed significant funds as well as legislation giving the university $22 million. Much of the money used would go into upgrades for the chiller system and fixing roads. (Johnson, 2021)
Continuous efforts to raise money and funds from legislation pushed for more construction and master plan realization. The mid-90s saw construction of many buildings around today including the Early Childhood Development Center, Miramar, the Support Services Center, Center for Instruction, the Central Plant, and the Center for Environmental Science (now called the Carlos Truan Natural Resource Center) (". . . Toward a bright future," 1994). The buildings are in the same area as planned, only the shapes are different. The biggest change went to the student housing, Instead of a five story apartment building, the dorms became several 2-3 story buildings with several rooms still having a view of the bay.
TAMU-CC’s growth had caused issues with campus dining. The main building for food servicing was the Glasscock building and the university outgrew it. The University Center was built in response and it’s facilities provide five times the space for campus dining. The building also provided a post office, bank, TV, offices, a bookstore, and study rooms. The building would open in 1999 ("Work Begins on A&M-CC student center," 1997).
The 2000 milestone era saw continued growth and construction. In 2001, The Science and Technology Building would be created right behind the Center For Sciences. The building would later be renamed the Robert R. Ferguson Engineering Building in 2018. More science space would be created through the Harte Research Institute after Edward H. Harte gave a donation of $46 million to the university. The largest gift the university had ever received. (Johnson, 2021)
Enrollment continued to grow and students still found themselves still cramped in their classroom buildings. While enrollment predictions for 2010 had dropped to 10,000, instead of 12,000 like before, the island University still could not create enough facilities to satisfy the growing pains from enrollment. To help this, Bay Hall was created. The need for more classroom space was so great, that classes were held before the building was even finished. The get the building done quicker, construction workers were pulled from the Harte Research Institute construction site to get the project done. ("Building at A&M-CC much needed, 2005) ("A&M-CC Bay Hall building near done." 2005),.
The university was also expanding in health sciences with the addition of Island Hall and Dugan Wellness center where the master plan had labelled “Physical Education.” Island Hall created a home for the nursing program and the Dugan replaced the Glasscock Building as the Wellness Center. (Johnson, 2021).
In 2013, the university worked with Broaddus Planning to create the next campus plan. This plan is the first one to incorporate the Momentum Campus as well as the island campus. It projects that by 2025, enrollment will roughly double from Fall 2012 to over 20,000 students, total building space will reach 5 million gross square feet and students will need over 3,000 beds and research spending, and annual research expenditures will triple to over $45 million (TAMU-CC Campus Master Plan Executive Summary, September 2013).
Spatially, the plan clusters new science, engineering, and research buildings to the west liberal arts to the west, and student life to the south. New features that this plan suggests are access to the University Beach, the creation of an aquatics center, amphitheater, viewing tower, and designates the southwest corner as a new Visitor and Interpretive Research Center as the new "front door" of the campus. Meanwhile, the Momentum Campus—building on the 2008 Campus Expansion Plan—is slated for athletics, additional and graduate housing, administrative and auxiliary services, and a mixed-use Islander Town district anchored by a multi-use Convocation Center (TAMU-CC, 2013).
The university eventually adopted a new plan in 2021 which stands as the current plan until 2030. The TAMU-CC 2021 Campus Master Plan outlines recommendations for the university’s current and future buildings, facilities, transportation, and landscaping over the next ten years and beyond. Major proposed projects include a new Welcome Center and Student Services building, an Arena and Convocation Center, a Student Aquatic Center, athletic facilities, and additional parking garages. These improvements are intended to support campus growth, expand student services, and provide better facilities for academic, recreational, and athletic activities. (TAMUCC 2021 Campus Master Plan).
The plan also focuses on improving transportation and accessibility across the Island and Momentum campuses. Proposed changes include a new campus loop road, relocating the primary bus stop, reorganizing parking areas, and adding safer pedestrian crossings. The university also hopes to improve connections between campuses through shuttle services and a pedestrian bridge across Oso Bay. (TAMUCC, 2021)
Another major priority is creating a more attractive and welcoming campus environment. Recommendations include expanding hiking and biking trails, developing a central University Park, adding shaded outdoor gathering spaces, improving landscaping, and protecting natural habitats around Ward Island. Overall, the plan aims to create a safer, more accessible, environmentally conscious, and student-friendly campus. Project timelines will depend on available funding, enrollment growth, and university priorities (TAMUCC, 2021)
The TAMU-CC Demographics and Enrollment report examines student demographics, enrollment trends, and future growth projections based on Fall 2019 data. Approximately 93% of students were Texas residents, with 30% coming from Nueces County. Most students lived within a 60-minute drive of campus. The university projected enrollment would increase from 11,000 students in 2019 to approximately 15,000 by 2030, with sign growth expected in graduate and doctoral programs (TAMUCC, 2021).
The report identifies several academic areas expected to expand, including Nursing and Health Sciences, Engineering, Business, Kinesiology, and Data Analytics. Graduate enrollment had already increased by 12% between 2014 and 2019, demonstrating growing demand for advanced degree programs. The university also anticipated expanding research activities and introducing additional doctoral programs (TAMUCC, 2021).
A major concern identified in the report is the lack of adequate campus facilities to support future growth. In 2019, TAMU-CC had an estimated shortage of 255,900 square feet of educational space, potentially increasing to 626,400 square feet by 2030 without additional construction or renovations. Additional classrooms, laboratories, libraries, offices, and specialized facilities for programs such as Music, Dance, and Theater would be necessary to accommodate the university's projected enrollment and academic expansion (TAMUCC, 2021).
Major proposed buildings
1. Welcome Center & Student Services
- A two-story building of approximately 100,000 square feet.
- Would provide space for student services and social interaction.
- Designed to create a more prominent entrance on the east side of campus.
- Would include a landscaped entrance plaza connecting visually and physically to the campus core.
- Estimated cost: $46.2 million.
2. Student Aquatic Center
- A two-story facility of approximately 112,000 square feet.
- Would replace the existing outdoor pool and be built where the ballfields were located.
- Planned to include a 50-meter Olympic-size pool, offices, an entrance plaza, and a new parking lot.
- Could have an indoor, outdoor, or hybrid pool design.
- Intended to support year-round swimming and potentially host competitions and events.
- Estimated cost: $74.2 million.
3. Arena & Convocation Center
- A building of approximately 100,000 square feet, with an arena seating around 4,000 people.
- Would include a competition court, fixed seating, pull-out bleachers, VIP facilities, locker rooms, and spectator support areas.
- Outdoor plazas would provide seating, landscaping, and gathering space.
- Intended to host athletic competitions and other large events.
- Estimated cost: $52.8 million.
4. Life Sciences & Engineering – Phase II
- A four-story academic building of approximately 104,000 square feet.
- Would contain classrooms, laboratories, and offices.
- Designed to resemble nearby Tidal Hall.
- Would require a new parking area and changes to the drive aisle between Starfish Lane and Island Boulevard.
- Intended to serve as a major feature at the west campus entrance.
- Estimated cost: $58.1 million.
5. Research/Academic Building
- A three-story building of approximately 130,000 square feet.
- Would expand the university’s research facilities.
- Potential programs include clinical psychology, health sciences, and autonomous systems.
- Construction would require removing Science Lab 1, the Conrad Blucher Institute for Surveying & Science, Science Lab 2, and nearby smaller structures.
- A raised pedestrian bridge would connect it to the Carlos Truan Natural Resources Center.
- Estimated cost: $76 million.
6. Athletic Administration & Support Building
- A one-story building of approximately 25,000 square feet.
- Would include weight-training areas, coaching offices, equipment storage, and athletic tutoring.
- Would be located near the southwest corner of Ennis Joslin Road and Nile Drive on the Momentum Campus.
- Intended to support the university’s athletic facilities as they move to the Momentum Campus.
- Estimated cost: $12.2 million.
7. Momentum Parking Garage with Retail
- A two- or three-story parking garage.
- Would include approximately 7,000 square feet of retail space on the first floor, facing Islander Way.
- Would provide parking for the proposed Arena and other Momentum Campus facilities.
- Could also support a park-and-ride system for the Island Campus if the university operated its own shuttle service.
- Estimated cost: 14million–17.5 million.
8. Arts & Media Building
- Proposed as a three-story building with approximately 165,000 gross square feet.
- Would support undergraduate and graduate programs in:
- Music
- Theater
- Dance
- Media arts
- Would feature a new vehicle drop-off area and an enhanced landscaped entrance on the north side, with views toward Corpus Christi Bay.
- Would create the eastern boundary of an arts quad bordered by the Center for the Arts and Bay Hall.
- Estimated construction cost: $98,319,200 (based on 2021 values).
The first building being constructed from this plan is the Arts and Media Building which has been given the name "Seaview Hall." The building will feature a 200-seat recital hall, a 325-seat proscenium theatre, a 166-seat black box theatre, a dance studio, rehearsal rooms, and specialized workshops. These facilities will provide students and faculty with improved spaces for practicing, rehearsing, and performing while also creating opportunities for community performances and cultural events throughout the Coastal Bend (Sandoval, 2025)
The project received $45 million in state funding through Senate Bill 52, along with support from university leaders and donors. Once completed, the building will also help expand the university’s arts programs and community involvement. Additionally, the existing Center for the Arts will receive renovations to support other creative programs, while the 1,350-seat Performing Arts Center will continue hosting larger performances and community events (Sandoval, 2025).
References
1991-2000 Campus Master Plan, 1991-2000, RG2.9.12, Box: 9 RG 2, Folder: 12. Office of the President, RG-2. Special Collections and Archives, Mary and Jeff Bell Library, Texas A&M University-Corpus Christi.
. . . toward a bright future. (1994, August 24). Corpus Christi Caller TImes, 48–49.
A&I-CC Classroom building named “Corpus Christi Hall.” (1975, April 18). Corpus Christi Caller-Times, 12.
A&I-CC Faculty Office Space Ready. (1975, January 8). Corpus Christi Caller-Times, 11.
A&M-CC Bay Hall building near done. (2005, August 26). Corpus Christi Caller TImes, 13.
Binder - 1988 Corpus Christi State University Campus Development Plan, 1988 April, RG28.1.2, Box: 1 RG 28, Folder: 2. Facilities Services , RG-12. Special Collections and Archives, Mary and Jeff Bell Library, Texas A&M University-Corpus Christi.
Building at A&M-CC much needed. (2005, April 25). Corpus Christi Caller-Times, 6.
CCSU planning apartments. (1981, November 11). Corpus Christi Caller TImes, 96.
Construction Booming at A&I-CC. (1977, March 3). Corpus Christi Caller-Times, 22.
Dedication is set for CCSU facility. (1981, May 9). Corpus Christi Caller TImes, 27.
Johnson, A. (2021). The Island University: A History of Texas A&M University-Corpus Christi. Mary and Jeff Bell Library at Texas A&M University-Corpus Christi. https://odp.library.tamu.edu/tamucchistory/
Layout of Campus to Change. (1973, July 1). Corpus Christi Caller-Times, 60–61.
Legislative Board Proposes Cuts in A&I Budget. (1973, February 9). Corpus Christi Caller TImes.
Office Laboratory will be dedicated at UCC. (1969, December 7). Corpus Christi Caller-Times, 33.
Proposed Development of the University of Corpus Christi. (1952, November). [Campus Plan]. Harland Bartholomew and Associates.
Reiste, B. (1981, June 2). CCSU uilding is in limbo. Corpus Christi Caller TImes, 26.
Sandoval, B. (2025, August 26). Texas A&M-corpus christi reaches new heights with topping out of arts and media building. Texas A&M University-Corpus Christi. https://www.tamucc.edu/news/2025/08/texas-am-corpus-christi-reaches-new-heights-with-topping-out-of-arts-and-media-building.php
TAMUCC 2021 Campus Master Plan. (2021, August). [Campus plan]. Texas A&M University- Corpus Christi.
TAMU-CC Campus Master Plan Executive Summary, Septemeber 2013, RG2.5.7, Box: 5 RG2, Folder: 7. Office of the President, RG-2. Special Collections and Archives, Mary and Jeff Bell Library, Texas A&M University-Corpus Christi.
University board will move office to King Ranch. (1981, March 13). Corpus Christi Caller TImes, 1.
Work begins on A&M-CC student center. (1997, September 4). Corpus Christi Caller TImes, 16.
Wrotenbery, C. R. (1998). Baptist island college: An interpretive history of the University of Corpus Christi, 1946-1973. Eakin Press.