Construction General Permit: Storm Water discharges from construction activities may require a permit from the Texas Commission on Environmental Quality (TCEQ). Permit information can be found at: https://www.tceq.texas.gov/
Construction activities that disturb less than 1 acre, and are not part of a larger common plan of development that would disturb 1 or more acres, are not required to obtain coverage under this general permit.
Construction activities which disturb at least 1 but less than 5 acres, or are part of a larger common plan of development that will disturb at least 1 but less than 5 acres, are regulated under the Construction General Permit and require a Notice of Intent submitted to TCEQ and a Site Notice for Small Construction Activities posted at the site.
Construction activities which disturb 5 or more acres, or are part of a larger common plan of development that will disturb 5 or more acres, are regulated under the Construction General Permit and require a Notice of Intent submitted to TCEQ, a Site Notice for “Primary Operators” of Large Construction Activities and a Site Notice for “Secondary Operators” of Large Construction Activities posted at the site.
Storm Water Pollution Prevention Plan (SWP3) Requirements:
Operators of construction activities that qualify for coverage under the Construction General Permit and that discharge storm water associated with construction activities into surface water in the state must:
Develop a SWP3 according to the provisions of the general permit that covers the entire site and begin implementation of that plan prior to commencing construction activities.
Post a signed copy of a TCEQ approved site notice in a location at the construction site where it is readily available for viewing prior to commencing construction activities and maintain the notice in that location until completion of the construction activity and final stabilization of the site.
Ensure the project specifications allow or provide that adequate Best Management Practices (BMPs) may be developed and modified as necessary to meet the requirements of the general permit and the SWP3.
Ensure that the SWP3 identifies the applicable personnel responsible for implementation of control measures described in the plan.
Submit the SWP3 with the Site Safety Plan
Litter Control: Maintain a clean litter free work site. DO NOT over fill dumpsters allocated for construction material.